Home / Industrial Parks Catalog / Industrial Park “DIONIS ENERGO ECO PARK”, Zhytomyr region

Industrial Park “DIONIS ENERGO ECO PARK”, Zhytomyr region

Industrial Park “DIONIS ENERGO ECO PARK”, Zhytomyr region
Area: 13.2292 Ha
Concept creation
Registration of an individual entrepreneur
Room parameters
Premises type Ready or under construction sq.m. Planned sq.m.
Industrial 0 46,480
Warehouse 0 4,691
Office, administrative 0 670

 

Description of communications
View Available Planned
Electricity 0 5 MW
Water supply 0 500 cubic meters/hour
Sewerage 0 Yes
Gas 0 100 cubic meters/hour
Access road Adjacent to the site
Railway branch No

 

Location

The land plot is located between the villages of Dekhtyarka, Stavyshche and Kozhanka, on the border of Zhytomyr and Kyiv regions.

The land plot is located 5.6 km from the T1013 highway. This is a highway of territorial significance in Kyiv region. It passes through the territory of Fastiv and Bila Tserkva districts. The total length is 74.1 km. It passes through the settlements of Fastiv, Bortnyky, Kozhanka, Malopolovetske, Tarasivka, Velykopolovetske, Pushchyky, Trushky, Yablunivka, Mala Skvirka, Horodyshche-Pustovarivske, Mykhailivka, Berezna, Volodarka. The highway connects with P04 (Kyiv – Zvenyhorodka), P19 (Fastiv – Rzhyshchiv), T1028 (Fastiv – Kocheriv), H02 (Radyvyliv – Sofiivka), P17 (Bila Tserkva – Humenne), P18 (Zhytomyr – Stavyshche).

Distances from the land plot to:

  • International highway E95, Chernihiv (Ukraine) – Merzifon (Turkey) – 49 km;
  • Fastiv railway junction – 22 km;
  • Kyiv capital – 94 km;
  • Kozyatyn railway junction – 93.4 km;
  • Zhytomyr regional center – 95 km;
  • Boryspil airport – 119 km;
  • Odesa port – 506 km;
  • Border crossing point with Poland Ustyluh – 553 km;

Labor resources

The total population of the Zhytomyr region is 1,179,000 people.

The population of the Zhytomyr district is 606,433 people

Project features, development concept

The project envisages the creation of a modern industrial site, on the territory of which it is planned to build awaste processing plant. The future enterprise will specialize in waste processing with the subsequent production of electricity, biogas and other useful products, which will significantly increase the efficiency of resource use and reduce the environmental load.

The planning structure of the territory determined for the development of the master plan for the location of the industrial site of the industrial park is formed in the system of adjacent development in accordance with the existing General Plan. According to the functional use, the design site provides for the location of a public area (administrative building) and an industrial and warehouse area.

Technical zones are separately allocated with the placement of a solar power plant, garbage container sites, a fire tank, local treatment facilities and a fire extinguishing agent storage site.

The necessary complex of engineering and technical structures for the full functioning of the facilities is fully located within the design area.

Format of cooperation with residents (participants/other participants)

Sublease of a land plot for construction

We provide a sublease of a land plot for the future construction of your facility. We are ready to provide additional design and construction support services.

Sublease terms and service fees (security, cleaning, maintenance of communications) are formed individually, upon request from a potential participant.

Parameters
Status: registered on 28.11.2025 р.
Website:
Area: 13,2292 Ha
Type: greenfield
Initiator/type of industrial park: private
Land plot: rented from the initiator
Landholder: communal property
Options for transferring land to participants/other participants
Selling
Rent
Sublease Yes

Location

Contacts

Monday - Friday: 9:00-18:00 Saturday - Week: closed
Do you have any questions?
Communication option
Other projects
loader